全球免费使用

混凝土计算器:立方码、立方米和袋数

估算地坪、露台、基脚或圆形柱坑所需的混凝土量(以立方码和立方米计),以及需要购买的预拌混凝土袋数。

你的数据只保留在此标签页中。我们不会收到你的文件、粘贴的文本或计算数值。

输入

提示:按 Ctrl + Enter 运行

你的结果

结果将显示在这里。

下方的详细帮助目前仅提供英文版。

关于此工具

Running short of concrete halfway through a pour is a real problem, and over-ordering wastes money. This calculator estimates the volume for a rectangular slab, patio or footing, or for one or more round post holes or columns, in cubic yards, cubic metres and cubic feet. It also estimates how many premix bags you would need in common North American (80, 60, 40 lb) and metric (30, 25 kg) sizes.

Bag counts use typical yields. For more than about one cubic yard, ready-mix delivery is usually cheaper and much less work than mixing bags.

使用方法

  1. Choose slab or round column/post hole, and imperial or metric units.
  2. For a slab, enter length, width (ft or m) and thickness (inches or cm).
  3. For columns, enter diameter (inches or cm), depth (ft or m) and how many.
  4. Add a waste allowance (5–10%) and run it.

计算原理

Slab volume = length × width × thickness. Column volume = π × (diameter ÷ 2)² × height × quantity. Volume is increased by the waste percentage and divided by typical bag yields (80 lb ≈ 0.6 ft³, 60 lb ≈ 0.45 ft³, 40 lb ≈ 0.3 ft³, 30 kg ≈ 0.5 ft³, 25 kg ≈ 0.42 ft³). 1 yd³ = 27 ft³ = 0.7646 m³.

slab = length × width × thickness · column = π × (diameter ÷ 2)² × height · 1 yd³ = 27 ft³ = 0.7646 m³

计算示例

A 12 × 10 ft shed base, 4 inches thick, with 10% extra needs 44 ft³: 1.63 cubic yards or 1.246 m³. That is about 74 bags of 80 lb premix, which is a lot of mixing, so ordering ready-mix is worth pricing. Six fence-post holes, 30 cm wide and 1.2 m deep, need 0.534 m³ including 5% waste.

示例输入和结果

形状: 地坪、露台或基脚
单位: 英尺和英寸
长度(ft 或 m): 10
宽度(ft 或 m): 10
厚度(in 或 cm): 4
圆柱直径(in 或 cm): 12
圆柱深度或高度(ft 或 m): 4
数量: 1
损耗余量(%): 5

→ 立方码: 1.3 yd³
→ 立方米: 0.991 m³
→ 立方英尺: 35 ft³
→ 预拌混凝土袋(英制规格): 80 lb: 59 · 60 lb: 78 · 40 lb: 117
→ 预拌混凝土袋(公制规格): 30 kg: 70 · 25 kg: 84

局限性

  • Rectangular slabs and round columns only.
  • Bag yields vary by brand; check the bag.
  • Does not design reinforcement or gravel base.

最后更新:

常见问题

How thick should a slab be?

Four inches (10 cm) is common for walkways and shed bases; driveways and heavier loads usually need 5–6 inches. Check local building codes.

Why add waste?

Uneven ground, spillage and form flex all use extra concrete. 5–10% is usual.

Should I subtract the post’s volume from a post hole?

Yes, for accuracy. The calculator fills the whole hole, so it slightly overestimates.

故障排除

The volume is 12 times too large.

Slab thickness is in inches (or cm), not feet (or m). Enter 4, not 0.33.

Bag counts seem huge.

They are realistic: a cubic yard is about 45 bags of 80 lb. Consider ready-mix.

Ready-mix suppliers quote in m³.

Use the cubic-metre figure, rounded up to their minimum increment.

隐私 & 免费使用

我的输入会被保存吗?

你的数据只保留在此标签页中。我们不会收到你的文件、粘贴的文本或计算数值。

这个工具免费吗?

是的。无需注册或付费。

在浏览器中处理

推荐下一步